SOURCE-LINKED U.S. REGISTRY

1623 Farnam

1623 Farnam · Omaha, NE · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
1623 Farnam Street
Coordinates
41.2578, -95.9375
Serving utility, source-reported
Not established
Operational capacity, source-reported
8 MW
Planned capacity, source-reported
Not published
Source record updated
2026-10-28

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Operational

    Final two data halls completed June 2025, adding 1.5 MW of IT capacity and space for 280 racks.

    Underlying source

Source notes

Omaha's carrier hotel: a nine-story, ~75,000 sq ft facility with around 8 MW of capacity at 1623 Farnam Street downtown, home to the OmahaIX internet exchange and some 60 carriers. News Press & Gazette Co. subsidiary Berks Group acquired Nebraska Data Centers and the 1623 Farnam carrier hotel in 2018 and established 1623 Farnam LLC, so 'Nebraska Data Centers' as an operator name is historical, not current. Build-out history: a $10 million expansion in 2019 built out the fifth floor, floors six through nine were added in 2021, and the final two data halls completed in June 2025 added 1.5 MW of IT capacity and space for 280 racks. CEO Bill Severn cites 'significant demand from AI workloads, edge deployments, content platforms, and broadband networks'. The company is separately planning an OMA2 campus expansion explicitly aimed at AI and edge infrastructure growth, with no site, size or date disclosed on its own page; it is not listed separately as of August 2026. DCD also reports the facility serves Trump Media & Technology Group; DCD attributes that tenant claim to other reporting, and it is not otherwise recorded. The recorded capacity is the ~8 MW total, not the 1.5 MW increment; no investment figure is recorded, because the only sourced amount is the $10 million 2019 fifth-floor expansion and, as of October 2026, neither cited source gives a total site investment. Coordinates are a street-address approximation.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.