9LDG Niagara AI Data Center

9 Lives Digital Group (9LDG) · Niagara Falls, NY · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
3807 Highland Ave.
Coordinates
43.0628, -79.0175
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    9LDG announces AI data center plans; acquisition of former Globe Metallurgical plant at 3807 Highland Avenue closed July 16, 2024 for ~$3M; 18-24 month construction timeline announced

    Underlying source

Source notes

Coordinates are approximate (3807 Highland Ave, Niagara Falls NY). 9LDG stated it will collaborate with an existing data center developer rather than build independently. Company president Michael Bagley leads a three-person partnership; partners not publicly identified. No prior data center development experience disclosed. As of September 2026, no coverage later than the 2024 acquisition coverage had been found for this specific project (3807 Highland Ave / Globe Metallurgical) in 2025-2026: no permit, no site plan, no construction. 2026 Niagara Falls data-center news is dominated by the separate Niagara Falls Redevelopment / Urbacon 'Niagara Digital Campus' on Falls Street, which is tracked as a different record as of September 2026. As of September 2026, no capacity, water or subsidy figure could be sourced for the 9LDG site. The energy source is recorded as hydro because Data Center Dynamics reports that the site was selected for its availability of electricity, hydropower and water for cooling.

100MW substation on-site at former Globe Metallurgical plant; site selected for hydropower access and water cooling availability.