CLT-01 Campus (One Blockchain Spartanburg)
AIB Data Centers Inc. (One Blockchain LLC) · Moore, SC · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 34.8548673, -82.0126849
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- 40 MW
- Planned capacity, source-reported
- 65 MW
- Source record updated
- 2026-10-10
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Operational
10-Q describes an existing 40 MW facility generating substantially all revenue from bitcoin hosting, now being repurposed as the ~65 MW CLT-01 AI/HPC campus.
Underlying source
Source notes
Operated by One Blockchain LLC, wholly owned by AIB Data Centers Inc. (NYSE American: AIB; renamed from BlockchAIn Digital Infrastructure on 2026-06-25). The 10-Q states an existing 40 MW facility on leased land in Spartanburg County being repurposed into the ~65 MW CLT-01 AI/HPC campus via project entity AIB CLT1 LLC (formed 2026-06-23); revenue today is bitcoin hosting, hence an AI classification of mixed-use. Baxtel reports the address as 389 Tyger River Industrial Drive; that address is not in the SEC filing, so it is recorded here only as a note and the coordinate is the Tyger River Industrial Drive road centroid (approximate, not parcel-confirmed). Same industrial park as the cancelled TigerDC Project Spero record but a different operator and a different, already-built facility.
A 15-year Electric Service Agreement executed in Q2 2026 provides 65,000 kVA of contract demand (25 MW added to the existing 40 MW energized facility). The existing 40 MW facility was de-energized on June 5, 2026 and had not resumed hosting as of Aug. 13, 2026.
Sources and provenance
- AIB Data Centers Inc. Form 10-Q for the quarter ended 2026-06-30 · source retrieved 2026-10-10
- Baxtel — BlockchAIn: Spartanburg, SC data center · source retrieved 2026-09-22
- dcmap.us — South Carolina data center map (One BlockchAIn Spartanburg, Moore, operational) · source retrieved 2026-09-22
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.