Cetronia Road Data Center (former Air Products site)
Air Products · Trexlertown, PA · United States
Facility record
- Lifecycle
- CancelledSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 40.5510536, -75.5965424
- Serving utility, source-reported
- PPL Electric
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-30
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Air Products proposed a 2.6M sq ft, three-building data center campus on its former HQ site along Hamilton Blvd and Cetronia Road.
Underlying source - Cancelled
Project ended. The Upper Macungie Township Zoning Hearing Board rejected Air Products' request to establish a data center on the 194-acre former headquarters property in a decision issued July 2026 (after a May 27, 2026 hearing). Air Products let the August 5, 2026 appeal deadline pass without appealing; spokesman Art George confirmed 'Air Products has decided not to pursue an appeal of the Upper Macungie Township Zoning Board decision.' No decision has been made on future ownership or use of the property.
Underlying source
Source notes
194-acre, ~2.6 million sq ft campus of three buildings (435,600 sq ft to 1.23M sq ft) on the former Air Products headquarters site at 7201 Hamilton Blvd, Upper Macungie Township.
Sources and provenance
- 2.6 million sq ft data center campus proposed in Pennsylvania · source retrieved 2026-07-17
- Giant data center proposal in Upper Macungie Township is in the works · source retrieved 2026-07-17
- Upper Macungie zoners weigh massive data center campus on former Air Products site · source retrieved 2026-07-17
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · source retrieved 2026-07-23
- Air Products abandons plan for data center at former Upper Macungie headquarters · source retrieved 2026-08-17
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.