SOURCE-LINKED U.S. REGISTRY

Aligned Coal City Campus

Aligned Data Centers · Coal City, IL · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
41.2575, -88.303
Serving utility, source-reported
ComEd
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-09-12

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Village Board adopted non-binding TIF inducement resolutions 26-09 and 26-10 on 24 June 2026; no TIF district, redevelopment agreement or zoning approval has been granted.

    Underlying source

Source notes

Roughly 305 acres in the Coal City industrial park near the southeast corner of Reed and Carbon Hill Roads, with Aligned Data Centers (Acquisition) PropCo, LLC as operator and The Reed Group, LLC as the local landowner/developer. Investment is described only as 'multi-billions of dollars' by the developer, so no figure is recorded. Distinct from the three tracked Aligned ORD buildings in Northlake and Elk Grove Village.

Developer-funded substation and switchyard connecting directly to the regional transmission system, described as at no cost to ratepayers.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory