Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
5601 Manor Woods Road
Coordinates
39.3417, -77.5089
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
72 MW
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Under construction

    Construction began October 2025 as the second building on Aligned's Quantum Frederick campus; the structure topped out March 9, 2026, fewer than five months after groundbreaking.

    Underlying source

Source notes

Two-story, 450,000 sq ft, 72 MW building — the second of four planned on Aligned's 75-acre, roughly 264 MW campus inside Quantum Frederick. About 345 skilled workers were on site at topping out with more than 80,000 craft hours logged.