SOURCE-LINKED U.S. REGISTRY

Aligned NEO-01

Aligned Data Centers · Sandusky (Perkins Township), OH · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
exact
Address as listed
Not published
Coordinates
41.4321977, -82.7189574
Serving utility, source-reported
Ohio Edison (FirstEnergy)
Operational capacity, source-reported
Not published
Planned capacity, source-reported
96 MW
Source record updated
2026-09-02

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

Confirmed via Aligned's Northeast Ohio page and DatacenterDynamics/JobsOhio press coverage; 2509 Hayes Ave, Sandusky, OH; 96MW/200,000 sq ft, under construction, official name NEO-01. AI/HPC (likely): Sandusky NEO-01 on Aligned DeltaFlow/Delta3 AI/HPC design.

NEO-01 in Sandusky (Perkins Township) connects to the FirstEnergy grid with Ohio Edison as the local distribution utility, delivering power feeds up to 80 MW (expandable beyond 200 MW at full build). No dedicated on-site generation or renewable PPA specific to this site was found.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory