Aligned ORD-01

Aligned Data Centers · Northlake, IL · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
exact
Address as listed
505 Northwest Ave
Coordinates
41.9140034, -87.9175163
Serving utility, source-reported
ComEd
Operational capacity, source-reported
48 MW
Planned capacity, source-reported
Not published
Source record updated
2026-10-15

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

Confirmed via Aligned Chicago page and DatacenterDynamics ('Aligned completes first Chicago data center'); 505 Northwest Ave, Northlake, IL; 48MW, operational. AI/HPC (likely): Northlake ORD-01 hyperscale, adaptive AI/HPC cooling platform.

Aligned's Chicagoland ORD-01 campus in Northlake draws redundant, critical power from two on-site substations (170 MW total capacity) fed by the Commonwealth Edison grid.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.