Aligned PDX-01
Aligned Data Centers · Hillsboro, OR · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- exact
- Address as listed
- Not published
- Coordinates
- 45.5540594, -122.9492507
- Serving utility, source-reported
- Portland General Electric (PGE)
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-09-02
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Confirmed operational, 27-acre campus at NE 30th Ave & NE Evergreen Rd, Hillsboro, OR. AI/HPC (likely): Hillsboro PDX-01 engineered on high-density AI/HPC cooling design.
PDX-01 draws grid power from Portland General Electric.
Sources and provenance
- Aligned facility directory · source retrieved 2026-09-02
- OpenStreetMap way/1114969101 · source retrieved 2026-07-22
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · source retrieved 2026-07-23
- Canary Media — Oregon utility tries out a faster, cheaper way to power data centers · source retrieved 2026-07-24
- DCD — Aligned tops out PDX-1 data center in Hillsboro, Oregon · source retrieved 2026-07-24
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.