SOURCE-LINKED U.S. REGISTRY

Aligned PHX-01/02/03

Aligned Data Centers · Phoenix, AZ · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
exact
Address as listed
Not published
Coordinates
33.6590546, -112.1111595
Serving utility, source-reported
Arizona Public Service (APS)
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-09-02

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

Confirmed operational via Aligned's Phoenix directory page; 55-acre Union Hills campus, PHX-01/02/03/05 buildings. AI/HPC (likely): Phoenix hosts Aligned Advanced Cooling Lab; DeltaFlow supports highest-density GPUs.

Aligned's Phoenix campus (2500 W Union Hills — matches PHX-01/02/03) is powered by APS via a custom 69kV enhanced-capability substation, PLUS a genuine 63 MW on-site microgrid generation project built jointly with APS — allowing the campus to island itself from the grid during congestion.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory