Aligned PHX-13
Aligned Data Centers · Glendale, AZ · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 33.5387, -112.186
- Serving utility, source-reported
- Arizona Public Service (APS)
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 72 MW
- Source record updated
- 2026-10-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Under construction
Aligned broke ground on PHX-13, a 72 MW facility, the first of four planned on its 100-acre Glendale campus, expanding its Arizona footprint
Underlying source
Source notes
PHX-13, a 72 MW facility in Glendale, Maricopa County, the first of four planned facilities on Aligned's 100-acre Glendale campus. The 100 acres cover the whole campus, so no land area is recorded for this facility. Coordinates are the Glendale area centroid. Data Center Dynamics reports that Aligned acquired 100 acres at 8785 N Reems Rd in December 2024 for $86.5M from LXP Industrial Trust, and also reports that PHX-13 is reportedly at 8805 N Reems Rd while another Aligned facility, PHX-07, is at 8785; as of October 2026, no cited source confirms that the purchase is the PHX-13 site. The $86.5M is land cost, not campus capex -> no investment figure is recorded. No job counts disclosed -> no job count is recorded. The campus likely uses Arizona's statutory data-center TPT exemption (A.R.S. 41-1519), but no ACA certification or GPLET agreement for this campus is public -> no subsidy is recorded.
APS is building a new 230 kV transmission line to serve the campus (DCNN); grid-sourced renewables, no on-site generation.
Sources and provenance
- Aligned Data Centers breaks ground in Glendale, expanding Arizona infrastructure · source retrieved 2026-09-14
- Aligned Data Centers breaks ground on Glendale facility (APS 230 kV line; closed-loop cooling) · source retrieved 2026-07-08
- Aligned Data Centers breaks ground - Glendale mayor praises PHX-13 · source retrieved 2026-07-08
- Aligned breaks ground on data center in Phoenix, Arizona ($86.5M for 100 acres) · source retrieved 2026-07-08
- ConstructConnect — Aligned Data Centers Breaks Ground on PHX-13 Facility · source retrieved 2026-08-28
- Aligned Data Centers Breaks Ground on Phx-13 Facility · source retrieved 2026-09-10
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.