Aligned Data Centers · Abernathy, TX · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
33.84, -101.84
Serving utility, source-reported
Xcel Energy
Operational capacity, source-reported
Not published
Planned capacity, source-reported
540 MW
Source record updated
2026-10-30

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Site selection and development agreement finalized in Hale County.

    Underlying source
  2. Under construction

    Groundbreaking April 9, 2026. LBB-01 inaugural data center targets Q1 2027 service date. Ryan Companies is general contractor.

    Underlying source

Source notes

Six facilities totaling 1.65 million sq ft across 313 acres. Largest data center groundbreaking in West Texas at time of announcement. TeraWulf separately targeting a data center campus in Abernathy for Fluidstack. Coordinates corrected: Abernathy TX is at approximately 33.84°N, 101.84°W; original record had longitude −101.55 which is ~15 miles east of the city.

Aligned is building and funding dedicated electrical infrastructure to protect local ratepayers. Xcel Energy is the key power partner. Regional renewable resources (solar, wind) available in Texas Panhandle.