Shippingport Industrial Park
Aligned Data Centers · Shippingport, PA · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 40.63, -80.44
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 2000 MW
- Source record updated
- 2026-10-30
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- ProposedUnderlying source
- Permitted
Conditional use granted. Data Center Dynamics reported on February 3, 2026 that the Shippingport Borough council had held a public hearing the week before on Aligned's conditional use requests and approved the use permit, and that council documents suggest the proposed campus is known as Project Phoenix.
Underlying source - Under construction
Aligned Data Centers broke ground on the 2 GW 'Project Phoenix' campus in Shippingport on September 10, 2026, moving the site from permitted to under construction.
Underlying source
Source notes
Aligned's Project Phoenix campus in the Shippingport Industrial Park, a former coal-plant site. Aligned's press release of September 10, 2026 describes a 2 GW campus spanning three facilities and announces the groundbreaking that day. Data Center Dynamics reported in February 2026 that Aligned was then planning two natural-gas-powered buildings within the 660-acre industrial park, with construction possibly starting later in 2026. The 660 acres is the size Data Center Dynamics gives for the whole industrial park, not a campus figure, so no land area is recorded; Marcellus Drilling News reports Aligned bought 650 acres from Frontier Group of Companies in July 2026 for $223 million.
Aligned's press release of September 10, 2026 says the campus will use its own dedicated onsite power source rather than the local electrical grid, next to the Shippingport Power Station, a former coal plant being redeveloped as a natural gas energy campus, and expects excess power to flow back to the grid once completed. The release describes a 2 GW campus; the Data Center Dynamics report of February 2026 gives no campus MW figure.
Sources and provenance
- Shippingport Industrial Park data center campus · source retrieved 2026-07-17
- Data Centers? Beaver County Can't Seem to Get Enough of Them · source retrieved 2026-08-17
- Beaver Valley could become center of AI infrastructure for region · source retrieved 2026-08-19
- Beaver Valley becomes data center target (Post-Gazette reprint, byline Anya Litvak and Chloe Jad, Feb 8 2026) · source retrieved 2026-08-19
- Shippingport data centers will be financial, health burdens on Beaver County residents · source retrieved 2026-08-19
- Aligned Data Centers and Shippingport Community Mark Revitalization of Legacy Energy Site with Groundbreaking of 2 GW "Project Phoenix" Campus · source retrieved 2026-09-25
- Aligned Breaks Ground on $10B, 2 GW Data Center in Beaver County · source retrieved 2026-09-12
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.