Alpha Energy 01 Data Center Campus (Tioga County)
Alpha Compute Corp. · , PA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 41.7741691, -77.254256
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 200 MW
- Source record updated
- 2026-10-15
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
First amendment to the binding term sheet adds a $47M seller note. The acquisition has not closed and is subject to county, PA DEP and SRBC approvals.
Underlying source
Source notes
Two contiguous surface parcels (about 155 and 88 acres) plus about 1,800 net Marcellus mineral acres. The $55M purchase price covers land and minerals, not project investment. Initial 200 MW with potential expansion to 1 GW. No township is named, so the pin is the Tioga County centroid. A separate 107-acre Beaver County parcel held for future use is not included.
Behind-the-meter generation using natural gas from the property, with no regional grid draw.
Sources and provenance
- Alpha Compute Secures $47 Million in Seller Financing for Planned 200MW Pennsylvania AI Data Center Campus · source retrieved 2026-10-15
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.