Amazon Data Services Reno Data Center Campus
Amazon Web Services · Sparks, NV · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 3800 Peru Drive
- Coordinates
- 39.517683, -119.479421
- Serving utility, source-reported
- NV Energy (Sierra Pacific Power Company)
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-09-11
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Under construction
NNDA announced Amazon had begun local hiring; AWS said 'As our first buildings come online, we are focused on hiring locally.'
Underlying source
Source notes
Located in the Tahoe-Reno Industrial Center approximately 15 miles east of Reno, in all or portions of Sections 10, 11, 14 and 15, T19N R22E, MDB&M. NNDA states the project sits at Switch's Citadel Campus; as of September 2026, it is tracked separately here because Amazon Data Services, Inc. holds its own air permit, address and buildings. Coordinates are a street-level approximation from OpenStreetMap's Peru Drive geometry - no parcel-confirmed point was published.
NV Energy opened a PUCN docket on 2026-05-27 seeking approval of a Large Load Electric Service Agreement with Amazon Data Services, Inc. for electric service to future data center facilities in Sparks, Nevada.
Sources and provenance
- NDEP Notice of Proposed Action - Amazon Data Services, Inc., Class I Air Quality OPTC AP7374-4768, 3800 Peru Drive, Sparks NV · source retrieved 2026-09-11
- NDEP Director's Review and Preliminary Determination - Amazon facility, Storey County, Nevada · source retrieved 2026-09-11
- NNDA press release: Hiring Event and Economic Opportunity for Amazon Data Center, Storey County (March 6, 2026) · source retrieved 2026-09-11
- NV Energy seeks large-load approvals for AWS, Prologis, Novva and Fleet data centers · source retrieved 2026-09-11
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.