Amazon Pecos County Data Center Campus
Amazon Data Services, Inc. · , TX · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 6000 TX-18
- Coordinates
- 30.8981, -102.8779
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Three buildings (A, B, C), 189,060 sq ft / $300M each ($900M total this phase), at 6000 TX-18, ~11 miles north of Fort Stockton; construction planned Aug-Dec 2026. To be powered initially off-grid by Pacifico Energy's 'GW Ranch' gas plant (as of August 2026, already tracked as GW Ranch; Construction Review Online reports that Amazon confirmed it acquired the GW Ranch site and plans to draw power directly from the plant, and, as of October 2026, no cited source says how far this campus's address is from the plant) with a path to future grid interconnection; distinct facility/operator from that record and from Microsoft's and Core Scientific's separate campuses at Pecos, in Reeves County. The map point is an approximate Fort Stockton-area point, not the campus site, which reporting places about 11 miles north of the city.
Sources and provenance
- Amazon Files Plans for New Data Center Buildings in Texas · source retrieved 2026-08-25
- Amazon's planned data center campus in Pecos County, Texas: Read Amazon's statement · source retrieved 2026-08-25
- Amazon Backs 7.65-GW Gas Plant in Texas to Power New AI Data Center Campus · source retrieved 2026-10-28
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.