SOURCE-LINKED U.S. REGISTRY

Applied Digital Adair County Data Center

Applied Digital · Adair, IA · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
41.5005601, -94.6434954
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
200 MW
Source record updated
2026-09-04

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Adair County supervisors discussed the proposed data center and set a public hearing on a setback ordinance; construction had been proposed for summer or fall 2024.

    Underlying source

Source notes

Proposed southeast of Adair adjacent to a NextEra Energy substation. Local reporting put projected employment at 40-70 full-time positions with 50-200 construction workers; those are ranges and are not recorded as a jobs figure. The most recent primary reporting found dates to April 2024, and Adair County put its large-scale building ordinance on hold the following month, so the project's current standing is uncertain. Confidence is reported, and the 200 MW figure comes from a third-party project tracker, not from the developer.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory