Applied Digital Delta Forge 1 AI Factory Campus

Applied Digital Corporation · Boyce, LA · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
31.4, -92.65
Serving utility, source-reported
Cleco
Operational capacity, source-reported
Not published
Planned capacity, source-reported
300 MW
Source record updated
2026-10-30

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Applied Digital announces Delta Forge 1, a 430 MW AI Factory campus in an unnamed southern U.S. state, designed to initially support 430 MW of total utility power and up to 300 MW of critical IT load; the Rapides Parish location was not disclosed until May 2026.

    Underlying source
  2. Under construction

    Site development begins January 2026. Location publicly revealed as Boyce, Rapides Parish in May 2026.

    Underlying source

Source notes

Anchor tenant is an undisclosed investment-grade U.S. hyperscaler under a $7.5B, 15-year lease. Two initial facilities totaling 300 MW across 300 acres (of 672-acre secured site). Initial operations targeted mid-2027. Applied Digital HQ in Dallas, TX.

Cleco pays full cost of power infrastructure needed to serve campus (called 'largest economic development opportunity in Cleco's 90-plus year history'). Campus located on 300 acres of a 672-acre secured site.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.