Applied Digital Delta Forge 1 AI Factory Campus
Applied Digital Corporation · Boyce, LA · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 31.4, -92.65
- Serving utility, source-reported
- Cleco
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 300 MW
- Source record updated
- 2026-10-30
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Applied Digital announces Delta Forge 1, a 430 MW AI Factory campus in an unnamed southern U.S. state, designed to initially support 430 MW of total utility power and up to 300 MW of critical IT load; the Rapides Parish location was not disclosed until May 2026.
Underlying source - Under construction
Site development begins January 2026. Location publicly revealed as Boyce, Rapides Parish in May 2026.
Underlying source
Source notes
Anchor tenant is an undisclosed investment-grade U.S. hyperscaler under a $7.5B, 15-year lease. Two initial facilities totaling 300 MW across 300 acres (of 672-acre secured site). Initial operations targeted mid-2027. Applied Digital HQ in Dallas, TX.
Cleco pays full cost of power infrastructure needed to serve campus (called 'largest economic development opportunity in Cleco's 90-plus year history'). Campus located on 300 acres of a 672-acre secured site.
Sources and provenance
- Central Louisiana secures $3.6B Applied Digital AI Factory Campus · source retrieved 2026-09-15
- Rapides Parish lands massive $3.6B AI data center project · source retrieved 2026-07-06
- Cleco plans 756-MW gas plant alongside Rapides data center · source retrieved 2026-08-26
- Cleco looks to fast-track new generator for data center · source retrieved 2026-10-17
- Gov. Landry announces new multi-billion-dollar Applied Digital AI data center in Rapides Parish · source retrieved 2026-10-17
- Applied Digital Announces New U.S. Based High Investment-Grade Hyperscaler Tenant at Delta Forge 1, a 430 MW AI Factory Campus (April 23, 2026) · source retrieved 2026-10-28
- Applied Digital Breaks Ground on Delta Forge 1, a 430 MW AI Factory Campus in a Southern U.S. State (January 22, 2026) · source retrieved 2026-10-28
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.