SOURCE-LINKED U.S. REGISTRY

Applied Digital Delta Forge 2 (Brookwood AI Factory Campus)

Applied Digital · Brookwood, AL · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
33.2556719, -87.3208336
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
210 MW
Source record updated
2026-10-18

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Tuscaloosa County EDA approved incentives. Construction is scheduled to start Oct 1, 2026 and finish by Dec 31, 2028.

    Underlying source

Source notes

The site is about 160 acres within a 1,300-acre tract north of the 17,000 block of Brookwood Parkway. The tenant is an unnamed U.S. hyperscaler. This is separate from the tracked Youngwoo & Associates 'Project Brookwood', which lies west of the Applied Digital tract. Lat/lon is the Brookwood town centroid (OSM Nominatim), not the parcel.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory