Rock Point Data Center Project

Apricus Energy Partners · West Plains, WA · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
11703 W. Medical Lake Highway
Coordinates
47.621, -117.73
Serving utility, source-reported
Avista
Operational capacity, source-reported
Not published
Planned capacity, source-reported
1000 MW
Source record updated
2026-10-12

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

Conceptual-stage dual hydrogen-production-plus-data-center project; Avista's own engineering study projects only ~50MW available by 2030 (vs. the company's aspirational 1,000MW target), rising to ~650MW by 2033; no formal county application filed as of Aug 2026.

County records say up to 1,000 MW eventually; an Avista engineering study found ~50 MW deliverable by 2030 and up to 650 MW by 2033, with ~$184M assumed for new transmission, substations and interconnections.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.