Rock Point Data Center Project
Apricus Energy Partners · West Plains, WA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 11703 W. Medical Lake Highway
- Coordinates
- 47.621, -117.73
- Serving utility, source-reported
- Avista
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 1000 MW
- Source record updated
- 2026-10-12
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Conceptual-stage dual hydrogen-production-plus-data-center project; Avista's own engineering study projects only ~50MW available by 2030 (vs. the company's aspirational 1,000MW target), rising to ~650MW by 2033; no formal county application filed as of Aug 2026.
County records say up to 1,000 MW eventually; an Avista engineering study found ~50 MW deliverable by 2030 and up to 650 MW by 2033, with ~$184M assumed for new transmission, substations and interconnections.
Sources and provenance
- Company proposing massive West Plains data center · source retrieved 2026-10-12
- Avista confirms negotiations with company seeking to build large data center · source retrieved 2026-08-22