SOURCE-LINKED U.S. REGISTRY

Atterix Raton Advanced Digital Hub

Atterix LLC · Raton, NM · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
36.9033, -104.4392
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
50 MW
Source record updated
2026-10-17

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Raton City Commission approved a memorandum of understanding with Denver-based Atterix LLC for a six-month feasibility study on an advanced digital hub; the MOU bars the city from soliciting a similar project during that window.

    Underlying source

Source notes

Three-phase proposal: Phase 1 would convert a former Kmart on the south side of Raton into a data center drawing up to 5 MW, with later phases at a nearby power station and the city airport over roughly five years, totalling up to 50 MW. Nothing is approved — the feasibility study period ran to early August 2026 and the City Commission must still authorize any development. Atterix was incorporated in Colorado in December 2025.