Atterix Raton Advanced Digital Hub
Atterix LLC · Raton, NM · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 36.9033, -104.4392
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 50 MW
- Source record updated
- 2026-10-17
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Raton City Commission approved a memorandum of understanding with Denver-based Atterix LLC for a six-month feasibility study on an advanced digital hub; the MOU bars the city from soliciting a similar project during that window.
Underlying source
Source notes
Three-phase proposal: Phase 1 would convert a former Kmart on the south side of Raton into a data center drawing up to 5 MW, with later phases at a nearby power station and the city airport over roughly five years, totalling up to 50 MW. Nothing is approved — the feasibility study period ran to early August 2026 and the City Commission must still authorize any development. Atterix was incorporated in Colorado in December 2025.
Sources and provenance
- AI data center proposal in Raton draws opposition · source retrieved 2026-08-08
- Raton residents push back on proposed data center plans · source retrieved 2026-10-17
- Small northern New Mexico city postpones decision on data center moratorium · source retrieved 2026-08-08
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.