SOURCE-LINKED U.S. REGISTRY

Aurum Elk Data Center Project (Central City)

Aurum Capital Ventures · Central City, IA · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
42.2039, -91.5243
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
4 MW
Source record updated
2026-10-28

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Council supports a proposed facility of about 18,500 sq ft. No building plan has been submitted, and the property has not yet been purchased.

    Underlying source

Source notes

About 18,000 sq ft on about 3 acres within city limits near the Linn County Fairgrounds. Reported draw is 4 MW. The city is drafting an ordinance under a moratorium.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory