SOURCE-LINKED U.S. REGISTRY

AWS New Albany (2550 Beech Road)

Amazon Web Services · New Albany, OH · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
40.094442, -82.750086
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-28

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Operational

    Operational since ~2017 per data-center aggregators (Baxtel, which lists the building as 'Park Two', ~459,000 sq ft). The parcel is owned by Vadata Inc, Amazon's data-center subsidiary, and carries the auditor's built industrial land-use class (305), not vacant (300).

    Underlying source

Source notes

Operational AWS data center campus on a parcel of about 67 acres (Licking County Auditor: 67.27 tax acres, 66.5 GIS acres) owned by Vadata Inc at 2550 Beech Rd NW — part of Amazon's original New Albany (AWS US-East-2) footprint, predating and physically distinct from the ~458-acre Beech/Miller five-building expansion (under construction, ~2.4 km north), which as of July 2026 is tracked separately as AWS New Albany (Beech/Miller Road Campus). Licking County Auditor land-use class 305 ('Research/Chemical Labs' = built industrial, vs class 300 'Industrial Vacant Land' on the neighboring expansion parcels); owner Vadata Inc (Amazon's data-center subsidiary). Data-center aggregators list the building as '2570 Beech Road' / 'Park Two' (a prior Compute Atlas note called it 'Ridge Two'), ~459,000 sq ft, operational since ~2017 — the building code-name and year rest on aggregator data, not a primary filing. As of October 2026, OpenStreetMap maps five AWS data-center buildings (CMH50, CMH53, CMH56, CMH59 and CMH62) inside this parcel; the ~459,000 sq ft aggregator figure describes a single building, so it is not the parcel total. No site-specific IT-load MW is disclosed. Coordinates are the Licking County Auditor parcel centroid. Distinct from tracked AWS Cosgray Road Campus and AWS Scioto Darby Campus (Hilliard, Franklin County).

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory