AWS New Albany (Beech/Miller Road Campus)

Amazon Web Services · New Albany, OH · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
40.11593, -82.75731
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-30

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Under construction

    $3.5B five-building expansion announced Sept 2023; two buildings completed and staffed by Aug 2025, remainder under construction

    Underlying source

Source notes

AWS's Licking-side New Albany expansion: a $3.5B, five-building, ~1.25M sq ft campus (announced Sept 2023, targeted through 2030) on the Amazon Data Services Beech Rd NW / Miller Rd NW parcel cluster (~458 ac). Two buildings were completed and staffed as of Aug 2025; the remainder are under construction. Adjacent to (but distinct from) AWS's pre-existing 2570 Beech Rd "Ridge Two" campus (operational since ~2017, a separate parcel not in this record). No site-specific IT-load MW is disclosed (a widely-repeated 500 MW figure is an AWS us-east-2 regional aggregate, not this campus). Amazon's 2023 Ohio Job Creation Tax Credit is a multi-site umbrella (17 facilities across Franklin/Licking/Union counties), not specific to this parcel. Distinct from the tracked AWS Cosgray Road and AWS Scioto Darby campuses (Hilliard, Franklin County, west of Columbus). As of 2026-08-08, the completion target has passed without confirmation. As of the city's 2025-08-07 update, two campus buildings were finished and staffed (as of August 2026, tracked separately as the 2550 and 3180 Beech Road records) with the remainder "expected to be operational by the end of the year" — i.e. end-2025. None of the cited sources confirms that happened, so this record stays listed as under construction rather than being promoted on an expectation.