SOURCE-LINKED U.S. REGISTRY

AWS Project Green Campus

Amazon Web Services · New Florence, MO · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
38.852, -91.52
Serving utility, source-reported
Ameren Missouri
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Application filed via NorthPoint Development, LLC for a 1,000-acre parcel at the northeast quadrant of I-70 and Highway 19 interchange near New Florence; two-phase campus of up to 21 data center buildings.

    Underlying source
  2. Permitted

    Montgomery County Commission unanimously approved the project and tax abatement incentive framework in December 2025; public safety entities (ambulance district, fire protection district) opted out of Chapter 100 participation and retained full tax allocations.

    Underlying source
  3. Under construction

    Construction under way by April 2026; Preserve Montgomery County LLC lawsuit filed in February 2026 pending. Governor Kehoe and AWS made the official public $10B investment announcement on June 15, 2026.

    Underlying source

Source notes

Codename 'Project Green'; application filed via NorthPoint Development, LLC. Two-phase build-out: Phase 1 = 8 data center buildings; Phase 2 = 13 additional buildings (21 total). Located on ~1,000 acres at northeast quadrant of I-70 and Highway 19 interchange near New Florence. Official AWS/Governor Kehoe announcement on June 15, 2026 cited a $10B investment commitment. Earlier county planning documents and initial filings referenced a maximum capital investment ceiling of up to $35B — that figure is a speculative ceiling, not a committed amount. AWS separately announced a 138MW renewable energy project in Missouri; not confirmed as dedicated to this campus. Community investments included in announcement: $3M for county 911/emergency dispatch upgrades, $3M for community programs, $1M for Montgomery County Fairgrounds, $150K community fund, $50K teacher grant. Preserve Montgomery County LLC filed suit in February 2026 alleging ten counts of Missouri Sunshine Law violations (closed-session negotiations, NDAs with Amazon); case pending as of mid-2026. First buildings targeted operational by 2027; full campus potentially complete ~2032. Coordinates are approximate (parcel centroid at I-70 / Hwy 19 NE quadrant). Jobs: KOMU reported ~400 permanent jobs; DCD's coverage of the same $10B announcement cited no specific permanent figure (only 'thousands of construction jobs') — permanent count left unstructured pending firm corroboration.

Powered by Ameren Missouri grid. AWS committed to working with Ameren to ensure project energy costs are not passed to other ratepayers. AWS announced a separate 138MW renewable energy project in Missouri (not confirmed as on-site or dedicated to this campus).

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.