AWS Hayden Run Campus

Amazon Web Services · Hilliard, OH · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
5109-5129 Hayden Run Rd
Coordinates
40.059949, -83.134305
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-28

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Operational

    First building completed ~2018 (AWS's first Ohio region facility, ground broken 2015) per data-center directories; Franklin County Auditor records the parcel with land-use class 'data center' and 768,498 sq ft of assessed building area (built).

    Underlying source

Source notes

AWS's first US East (Ohio) region data center — a ~55-acre Vadata Inc campus at 5109-5129 Hayden Run Rd, Hilliard. Broke ground 2015; first building completed ~2018; a multi-building campus that has continued expanding. Franklin County Auditor land-use class 'data center' with 768,498 sq ft of assessed building area (= built/operational); owner Vadata Inc (Amazon's data-center subsidiary). Data-center directories (DC Byte / baxtel) list several numbered Hayden Run buildings (5109/5113/5117/5121/5125) that correspond to buildings within this single county parcel, not separate sites. No site-specific IT-load MW is disclosed. Coordinates are the Franklin County Auditor parcel centroid. Distinct from the tracked AWS Cosgray Road and AWS Scioto Darby campuses (also Hilliard, Franklin County).

Hayden Run (5109 Hayden Run Rd, Hilliard) is AWS's original Hilliard campus (construction began 2015). The PUCO-approved 73MW Bloom Energy fuel-cell project (228 SOFC units) is confirmed sited at 4120 Scioto Darby Creek Rd — AWS's third, separate Hilliard campus at Scioto Darby Rd/I-270 — not at Hayden Run.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.