AWS Industrial Parkway Campus (Jerome Township)
Amazon Web Services · Plain City, OH · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 40.134553, -83.212394
- Serving utility, source-reported
- Consolidated Electric Coop
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Operational
Union County Auditor records Amazon Data Services Inc buildings on the parcel as built in 2024 (two entries of 215,144 sq ft each) and 2025 (151,305 sq ft), with a $254.3M appraised building value; WOSU (Sept 2025) confirms two operational AWS data centers in Jerome Township.
Underlying source
Source notes
Operational AWS data center on an ~86-acre Amazon Data Services Inc parcel at 8565 Industrial Pkwy, Jerome Township / Plain City, Union County — part of Amazon's AWS US-East-2 (Ohio) cluster in the Jerome Township / 'New California' corridor first announced Nov 2019 ($200M, ~125 acres at the NW corner of Warner Rd / Industrial Pkwy). As of October 2026, Union County Auditor building records for the parcel list three entries: one built in 2025 (151,305 sq ft) and two built in 2024 (215,144 sq ft each), with a parcel appraised building value of $254.3M. Sits ~2 km north of the Amazon Warner Rd campus (tracked separately as of July 2026) and is distinct from the still-vacant AWS 'Project Cosmos' site ~9 mi north in Marysville (Paris Township). No site-specific IT-load MW is disclosed. The pin lies inside the Union County Auditor parcel polygon, about 100 m from its centroid, and is an approximate pin.
AWS Industrial Parkway Campus (Plain City, in Union County's Jerome Township) is listed by the datacenter.fyi registry as connected to the Consolidated Electric Coop grid. As of July 2026, no site-specific clean-energy PPA or on-site generation was found.
Sources and provenance
- Union County Auditor building record (parcel 1500220390010 / 8565 Industrial Pkwy — Amazon Data Services Inc, building entries built 2024 (215,144 sq ft x2) and 2025 (151,305 sq ft), $254.3M appraised building value, 86.2 ac) · source retrieved 2026-07-19
- Amazon primed: Technology giant plans $200 million data center in Union County (Nov 2019) — the Jerome Township AWS cluster origin announcement, ~125 ac at NW corner of Warner Rd / Industrial Pkwy · source retrieved 2026-07-19
- Jerome Township puts pause on new data center development for nine months (Sep 2025) — confirms two operational AWS data centers in Jerome Township; AWS paid $1.1M Union County property tax in 2024 · source retrieved 2026-07-19
- Amazon AWS Industrial Parkway Campus — Plain City, OH (datacenter.fyi) · source retrieved 2026-07-24
- Amazon AWS CMH - Industrial Parkway Campus (Datacentermap) · source retrieved 2026-07-24
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.