AWS New Albany (Newton Court)
Amazon Web Services · New Albany, OH · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 40.093702, -82.72994
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Operational
Listed as built 2024 / fully operational by data-center directories; Licking County Auditor land-use class 305 ('Research/Chemical Labs' = built industrial) on the Amazon Data Services Inc parcel at 2575 Newton Ct.
Underlying source
Source notes
Operational AWS data center on a ~93-acre Amazon Data Services Inc parcel at 2575 Newton Ct, New Albany (~7 km south of the Beech/Miller cluster) — part of Amazon's AWS US-East-2 (Ohio) footprint. Data-center directories label it '2575 Newton' / 'Tower Ultra', built 2024 / fully operational. Licking County Auditor land-use class 305 ('Research/Chemical Labs' = built industrial); owner Amazon Data Services Inc. Data-center directories list numbered Newton addresses (2575/2675/2775/2875/2975) as separate sites, but only one Amazon-owned parcel (095-112074-00.000) exists at 2575 Newton Ct — the numbered addresses are buildings within this single parcel, not distinct sites. No site-specific IT-load MW is disclosed. Coordinates are the Licking County Auditor parcel centroid.
Part of the New Albany 'Silicon Heartland' campus cluster. No site-specific clean-energy deal or on-site generation found for this address; same caveat as other New Albany-area buildings — Amazon's documented Ohio renewables are company-wide, not site-tied.
Sources and provenance
- Licking County Auditor parcel/GIS record (parcel 095-112074-00.000, 2575 Newton Ct — Amazon Data Services Inc, Industrial land-use class 305 'Research/Chemical Labs' = built, 92.7 ac) · source retrieved 2026-07-19
- Amazon 2575 Newton ('Tower Ultra') — fully operational, built 2024, AWS US East (Ohio) region · source retrieved 2026-07-19
- AWS News Blog: More Amazon wind and solar farms are live · source retrieved 2026-07-24
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.