SOURCE-LINKED U.S. REGISTRY

AWS Project Cosmos

Amazon Web Services · Marysville, OH · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
40.237, -83.35
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    AWS files rezoning application for Marysville Innovation Park at 14684 Industrial Parkway

    Underlying source
  2. Permitted

    Marysville City Council approves Community Reinvestment Area agreement; 30-year 100% property tax exemption granted; permit issued March 10, 2025

    Underlying source
  3. Under construction

    City of Marysville FAQ confirms site readiness activities began early 2026 with construction running through 2027; DCD had projected August 2025 construction start from permit approval which appears to have been delayed. Two buildings (~250,000 sq ft each); completion targeted 2027.

    Underlying source

Source notes

14684 Industrial Parkway, Marysville OH 43040 (Union County, ~30 mi NW of Columbus). Two-building campus totaling ~500,000 sq ft on 55 acres. Also referenced as 'Project Cosmo' (without trailing 's') in DCD. Jobs updated to 50 per Marysville city FAQ ('at least 50 full-time operational jobs'); original record stated 25 from DCD/Amazon initial filing. Construction start updated to early 2026 per city FAQ; DCD had projected August 2025 which appears delayed. Part of AWS's broader $10B+ Ohio infrastructure commitment. Coordinates are approximate Marysville Innovation Park area.

Non-contact cooling; on-site water storage used during off-peak hours; city water supply only (no on-site wells)

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory