AWS Project Spectrum (Somervell/Hood County)
Amazon Data Services, Inc. · , TX · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 32.2373, -97.7561
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Up to 18 two-story buildings on Vistra-owned land adjacent to the Comanche Peak Nuclear Power Plant, with a Hood County portion of more than 1,265 acres at 2300 Coates Rd, Granbury, that Construction Review Online described as being coordinated with Hood County officials. As of October 2026, Baxtel (an aggregator) reports that Amazon said in September 2026 it would not build in Hood County; no primary source for that was found, so the Hood County portion is unconfirmed either way. The Texas Public Utility Commission docket Baxtel cites (59399, a joint application by Comanche Peak Power Company and Amazon Data Services for a net-metering arrangement) concerns the Somervell County power arrangement, and as of October 2026 its filing list does not mention Hood County; distinct facility/operator from the existing Vistra/AWS PPA power-generation record for Comanche Peak itself. Construction could commence 2027; still subject to finalized lease terms with Vistra.
Sources and provenance
- Amazon to Collocate $5 Billion Project Spectrum Data Center Campus in Texas with Nuclear Power Plant · source retrieved 2026-08-25
- Amazon: Comanche Peak Data Center (Baxtel) — history: Hood County plan of about 1,265 acres; Amazon said in September 2026 it would not build in Hood County · source retrieved 2026-10-28
- Public Utility Commission of Texas docket 59399 filing list — Joint application of Comanche Peak Power Company LLC and Amazon Data Services, Inc. for approval of a net metering arrangement · source retrieved 2026-10-28