AWS Scioto Darby Campus

Amazon Web Services · Hilliard, OH · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
4120 Scioto Darby Creek Rd
Coordinates
40.01895, -83.12439
Serving utility, source-reported
AEP Ohio (Ohio Power Company)View utility impact evidence
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-30

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Under construction

    152 acres / 6 parcels at 4120 Scioto Darby Rd, up to 7 buildings plus 1 utility/security building; land bought January 2021 for $15.29M.

    Underlying source
  2. Operational

    Status changed from under construction to operational. Franklin County Auditor assessed building area is populated (695,120 sq ft) on the campus parcel (050-002806, land-use class 'data center', Amazon Data Services Inc) = built, not a bare shell; data-center directories (DC Byte / datacenterHawk) list the campus's early buildings as operational with later phases still under construction. Expansion continues.

    Underlying source

Source notes

AWS's 3rd Hilliard campus, at 4120 Scioto Darby Rd. 152 acres across 6 parcels, up to 7 buildings plus 1 utility/security building; land bought January 2021 for $15.29M. Distinct from the tracked AWS Cosmos/Galaxy campuses and from the AWS Cosgray Road campus (also in Hilliard).

OPSB approved (2025-09-22) a 72.9 MW behind-the-meter solid oxide fuel cell facility (228 Bloom Energy units) at 4186 Scioto Darby Creek Rd, owned and operated by Ohio Power Company and serving Amazon only. Construction from Jan 2026, operation projected Sept 2027; intended as a bridge until AEP transmission capacity is available.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.