AWS Scioto Darby Campus
Amazon Web Services · Hilliard, OH · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 4120 Scioto Darby Creek Rd
- Coordinates
- 40.01895, -83.12439
- Serving utility, source-reported
- AEP Ohio (Ohio Power Company)View utility impact evidence
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-30
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Under construction
152 acres / 6 parcels at 4120 Scioto Darby Rd, up to 7 buildings plus 1 utility/security building; land bought January 2021 for $15.29M.
Underlying source - Operational
Status changed from under construction to operational. Franklin County Auditor assessed building area is populated (695,120 sq ft) on the campus parcel (050-002806, land-use class 'data center', Amazon Data Services Inc) = built, not a bare shell; data-center directories (DC Byte / datacenterHawk) list the campus's early buildings as operational with later phases still under construction. Expansion continues.
Underlying source
Source notes
AWS's 3rd Hilliard campus, at 4120 Scioto Darby Rd. 152 acres across 6 parcels, up to 7 buildings plus 1 utility/security building; land bought January 2021 for $15.29M. Distinct from the tracked AWS Cosmos/Galaxy campuses and from the AWS Cosgray Road campus (also in Hilliard).
OPSB approved (2025-09-22) a 72.9 MW behind-the-meter solid oxide fuel cell facility (228 Bloom Energy units) at 4186 Scioto Darby Creek Rd, owned and operated by Ohio Power Company and serving Amazon only. Construction from Jan 2026, operation projected Sept 2027; intended as a bridge until AEP transmission capacity is available.
Sources and provenance
- AWS planning third data center campus in Hilliard, Ohio · source retrieved 2026-07-17
- Amazon Scioto Darby Campus · source retrieved 2026-07-17
- Franklin County parcel/GIS record (parcel 050-002806, 4200 Scioto Darby Creek Rd — AMAZON DATA SERVICES INC, data-center use class, ~143 ac GIS) · source retrieved 2026-07-18
- Franklin County Auditor building record — parcel 050-002806 (4200 Scioto Darby Creek Rd, Amazon Data Services Inc): assessed building area 695,120 sq ft + land-use class 'data center' = built/operational · source retrieved 2026-07-19
- City of Hilliard: Scioto Darby Creek Road Fuel Cell Project — 72.9 MW, 228 Bloom SOFC units, AEP Ohio-owned, behind the meter for Amazon's Scioto Darby campus · source retrieved 2026-10-14
- Franklin County Auditor GIS: parcel 050-002806, 4120 Scioto Darby Crk, AMAZON DATA SERVICES INC, class 'data center' · source retrieved 2026-10-14
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.