Summit Crossing Tech Campus
Amazon Web Services · Massaponax, VA · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 38.18847901989237, -77.44053482811216
- Serving utility, source-reported
- Rappahannock Electric Co-op
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-07-26
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Under constructionUnderlying source
Source notes
One of Amazon Web Services' four Spotsylvania/Caroline data center campuses (Summit Crossing, Carter's Store, Cosner [ST23-0031; tracked separately as Cosner Technology Campus as of July 2026], Orrock [tracked separately as AWS Mattermeade Tech Campus as of July 2026]). ~231 acres, up to ~2.1M sq ft of data center buildings (Phase 1 max ~900k sq ft). Located on the south side of Summit Crossing Road, ~0.5 mi west of the Spotsylvania/Caroline county line; borders the Carter's Store campus. Amazon Data Services filed June 2023 to rezone from Rural (RU) to Industrial-1 (I-1); Board of Supervisors approved the four AWS rezonings in a 5-2 vote in October 2023 (Spotsylvania "ST23" case series). Reported under construction / buildings going up per The Fredericksburg Advance (2026). Coordinates approximate (Summit Crossing Road geocode; parcels not GIS-confirmed as of July 2026).
Sources and provenance
- Data Center Frontier — Amazon plans major data center expansion in Spotsylvania County (Summit Crossing: 231 ac, 2.1M sq ft) · source retrieved 2026-07-17
- The Fredericksburg Advance — Digital Insights: status of data centers in Spotsylvania (all four AWS campuses under construction, buildings going up) · source retrieved 2026-07-17
- Baxtel — Amazon Summit Crossing Tech Campus (231 ac, Phase 1 max 900k sq ft, rezoning approved Oct 2023) · source retrieved 2026-07-17
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · source retrieved 2026-07-23
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.