SOURCE-LINKED U.S. REGISTRY

AWS Trenton / Madison–St. Clair Township Campus

Amazon Web Services · Trenton, OH · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
39.4808905, -84.4577222
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-09-09

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Both townships objected to the annexation petition, leaving next steps to Butler County commissioners.

    Underlying source

Source notes

Roughly 600 acres in Madison and St. Clair townships straddling Wayne Madison and Hawkins roads, reported as a second AWS campus of about 18 buildings with an estimated project value near $690 million. The reporting also references a separate 141-acre site already inside Trenton city limits; as of September 2026, a 141-acre Prologis campus (Project Mila) is tracked separately at Trenton and no source read here links the two, so no relationship is asserted.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory