Westline Site / Dove Creek Technology Campus
Beacon Data Centers (via Westline TX Holdings) · San Angelo (Tankersley area, unincorporated), TX · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 31.335, -100.478
- Serving utility, source-reported
- Concho Valley Electric Co-op Inc
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-09-21
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
proposed per TCEQ Air Quality Permit No. 184380 application (Westline TX Holdings)
Underlying source
Source notes
Anchored to TCEQ Air Quality Permit application #184380 filed by Westline TX Holdings (Beacon Data Centers). Site is ~1,240 buildable acres near the FM 2335 / US-67 South junction along Spring Creek, Precinct 4, Tom Green County. County commissioners rejected a proposed 12-month data-center moratorium 2026-06-02, citing litigation risk — an implicit but real signal the project is proceeding through the county's process. No MW capacity or investment figure disclosed in any source reviewed; left null per zero-fabrication rule. Coordinates are an approximate geocode of the named road junction (Tankersley, TX), not a parcel centroid — recommend verifying against the TCEQ permit's exact site description if available. Single-source (Concho Observer reporting a TCEQ air-quality permit application); recorded reported-tier pending a second corroborating primary.
Sources and provenance
- TCEQ Air Quality Permit No. 184380 application (Westline TX Holdings) · source retrieved 2026-07-17
- Tom Green County Commissioners Reject Data Center Moratorium · source retrieved 2026-09-21
- Developer sheds light on Dove Creek data center as commissioners mull options · source retrieved 2026-07-17
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · source retrieved 2026-07-23