Project Mustang
Beale Infrastructure · Claremore, OK · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 36.31, -95.62
- Serving utility, source-reported
- Grand River Dam Authority (GRDA)
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-16
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- ProposedUnderlying source
Source notes
Within Claremore Industrial Park. Distinct from Beale Infrastructure's tracked Owasso, OK site (Project Clydesdale, a different location).
News 9: 'with power supplied by Grand River Dam Authority'. The developer says it will cover 100% of power-infrastructure costs tied to the project.
Sources and provenance
- Beale Project Mustang · source retrieved 2026-07-17
- Beale Infrastructure in talks to build Project Mustang data center campus outside Tulsa, Oklahoma · source retrieved 2026-09-21
- Claremore Project Mustang data center approved · source retrieved 2026-10-16
- Where are data centers being built across Oklahoma? · source retrieved 2026-10-16
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.