SOURCE-LINKED U.S. REGISTRY

Luther Horizon Technology Park

Beltline Energy · Luther, OK · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
35.6612, -97.1961
Serving utility, source-reported
Oklahoma Gas & Electric (OG&E)
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-08-19

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Described by the developer as in the community-input and regulatory-review process with the Town of Luther.

    Underlying source

Source notes

A third Beltline Energy site in Oklahoma, distinct from the tracked OKC/Frisco Road and Piedmont proposals. Coordinates are a Luther town-centroid approximation; the parcel is near OG&E's Redbud Energy Facility.

Site sits adjacent to OG&E's Redbud Energy Facility with both 138 kV and 345 kV transmission lines on-site; developer states it will cover 100% of infrastructure improvements under long-term utility service arrangements overseen by state regulators.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory