Meramec Valley Technology Park (Beltline Energy)
Beltline Energy (BLE Landholdings, LLC) · , MO · United States
Facility record
- Lifecycle
- PermittedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Phelan Road / Highway O, south of the Meramec River
- Coordinates
- 38.4385316, -90.7501765
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Beltline Energy presented a 500-acre, up-to-16-building, up-to-$16B campus off Highway O south of the Meramec River to the Pacific Board of Aldermen.
Underlying source - Permitted
Franklin County Board of Commissioners unanimously approved rezoning for the Beltline Energy project south of Pacific along Highway O. Beltline had withdrawn only its separate City of Pacific PUD application on Aug. 7, 2026, and said it would pursue the project with Franklin County.
Underlying source
Source notes
Also reported as the 'Crooked Creek' farm proposal and the 'Beltline Energy Project'. About 500 acres off Highway O south of the Meramec River, in unincorporated Franklin County outside Pacific's city limits. St. Louis Magazine reported a presentation of up to 16 buildings, 'up to a $16 billion total investment', and a project that, per Beltline partner Ryan Sanders, 'could draw as much as 1.2 Gigawatts if fully developed'. These are ceilings and a projected electric draw, not firm figures, so no planned capacity or investment figure is recorded. Jobs as presented: about 1,000 construction jobs per year over eight years and 360-500 full-time jobs (a range, so not structured). Franklin County P&Z recommended denial in April 2026. Beltline withdrew its City of Pacific PUD/annexation application on Aug. 7, 2026, after Pacific adopted a one-year moratorium, then pursued county rezoning, which the County Commission approved on Sept. 15, 2026. A Baxtel listing calls the project 'withdrawn'; it conflates the city withdrawal with the county track and is not relied on. Coordinates are the OSM point for Phelan Road (Baxtel lists 684 Phelan Rd), a road-level approximation, not a parcel centroid.
Sources and provenance
- Data centers approved by Franklin County Commissioners in Tuesday vote · source retrieved 2026-10-13
- Franklin County commissioners approve rezoning for Beltline and Gateway Digital Campus data centers · source retrieved 2026-10-13
- Beltline withdraws rezoning application, still committed to data center project · source retrieved 2026-10-13
- Pacific residents push back on $16B data center pitched for their slice of Franklin County · source retrieved 2026-10-13
- Pacific erupts over $16 billion data center · source retrieved 2026-10-13
- OpenStreetMap Nominatim geocode: Phelan Road, Franklin County, Missouri · source retrieved 2026-10-13