Beltline Energy Oklahoma City Campus
Beltline Energy · Oklahoma City, OK · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 3025 N Frisco Road
- Coordinates
- 35.49, -97.795
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 1000 MW
- Source record updated
- 2026-10-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Two adjoining parcels rezoned via PUD cases likely numbered PUD-2105 (111.5 acres at 3025 N. Frisco Road, near I-40/Frisco Rd) and PUD-2124 (184 acres at 13921 NW 23rd Street, near NW 23rd/Frisco Rd, ~0.5 mi west of Yukon) — the case-number-to-address pairing is probable (inferred by matching geographic descriptors across sources) but not confirmed by a single primary document naming both together. OKC Planning Commission voted 7-0 to recommend approval Jan 21 2026; the Oklahoma City Council voted 6-3 on Oct. 27, 2026 to rezone both tracts into planned unit development districts, with conditions on water, electricity and noise (OKCFOX, News9); the project then moves to plan submittal and permitting, so the record stays listed as proposed. Explicitly carved out of OKC's citywide data-center moratorium (~April 2026) as an already-pending application, confirming it remains active. Press coverage separately cites a larger '350-acre' and '480-acre' project total that doesn't reconcile with the confirmed 295.5-acre rezoned total (111.5+184) — the gap is plausibly an adjacent ~184.5-acre parcel Yukon Municipal Authority sold to BLE Landholdings LLC for $15.8M in Aug 2025 (near Hwy 66/Frisco Rd), which may be the same tract as the NW 23rd St parcel, but this is not confirmed. A $1B investment / 0.5GW capacity figure is associated with the broader Yukon-area BLE deal in local reporting but, as of July 2026, was not found tied specifically to this OKC rezoning by a primary source, so it is not recorded as this record's capacity or investment pending confirmation. The planned capacity of 1,000 MW comes from Investigate Midwest (July 2026), which gives it for the whole proposed campus straddling the Oklahoma City–Yukon border, not for the Oklahoma City rezoning alone.
Sources and provenance
- Data center wins rezoning approval from OKC planning board · source retrieved 2026-09-14
- A loophole leaves Oklahoma data center water consumption largely untracked · source retrieved 2026-09-14
- 'Once in a century development': OKC City Council votes 6-3 to rezone land for data center · source retrieved 2026-10-28
- Oklahoma City Council approves rezoning for data center project with conditions · source retrieved 2026-10-28
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.