Beltline Energy Piedmont Site
Beltline Energy · Piedmont, OK · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 35.74394, -97.81183
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
321-acre rezoning filed via BLE Holdings LLC / BLE Landholdings LLC, SW/4 of Section 26, Township 15N, Range 6W, Kingfisher County — legal descriptions and Kingfisher County parcel numbers 0000-26-15N-06W-3-000-00, -3-001-00, -3-002-00, -3-003-00 (plus an adjacent 5th parcel, -4-000-00) per the city's own PUD filing. Bounded by E 870 Rd (N), N 2920 Rd (E), Azalea St NW (S), N 2910 Rd (W). The Planning Commission deferred the vote on June 1, 2026, and in early October 2026 sent the master design plan to the City Council without approving it; no final decision was found as of October 2026. This is a distinct, separate, competing site from Cloverleaf's 630-acre 'Project Open Sky' proposal also in Piedmont (different parcels, different developer, different acreage) — despite sharing a host city, do not conflate the two (both independently confirmed as separate projects via direct source verification). As of July 2026, no primary-sourced capacity or investment figure was found for this specific site — omitted rather than guessed.
Sources and provenance
- Data Center Transparency Portal · source retrieved 2026-07-11
- Commission urges council to deny Cloverleaf plan; Beltline Energy vote delayed for review · source retrieved 2026-09-14
- Piedmont planning commission advances Beltline data center plan · source retrieved 2026-10-28
- Piedmont Planning Commission advances proposed data center rezoning · source retrieved 2026-10-28
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.