Big Digital Energy–10NetZero Hood County AI Data Center Campus
Big Digital Energy, Inc. / 10NetZero, Inc. (50/50 joint venture) · , TX · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 32.44194, -97.76472
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- 17 MW
- Planned capacity, source-reported
- 311 MW
- Source record updated
- 2026-09-08
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Site acquisition completed via 50/50 JV.
Source notes
Repurposing a power-ready ~50-acre industrial site (30,000+ sq ft of existing structures, 17 MW operational grid power, on-site gas pipelines) into an AI/HPC datacenter campus; acquisition completed 2026-07-20. AI datacenter build-out itself has not yet begun.
Sources and provenance
- Big Digital Energy and 10NetZero Complete Acquisition of Hood County, Texas Site · source retrieved 2026-09-08
- Big Digital Energy SEC exhibit re: Hood County / DFW-area site LOI · source retrieved 2026-09-08
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.