Bitdeer Clarington HPC/AI Campus
Bitdeer · Clarington, OH · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 39.7748, -80.8731
- Serving utility, source-reported
- AEP OhioView utility impact evidence
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 570 MW
- Source record updated
- 2026-10-22
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Under construction
Bitdeer signed a Letter of Agreement with AEP Ohio; full 570 MW targeted available by end of Q3 2026 (crypto→HPC/AI)
Underlying source
Source notes
Clarington, Monroe County; 570 MW via an AEP Ohio LOA, targeted available by end of Q3 2026. Bitdeer transitioning from bitcoin mining toward HPC/AI. Coordinates are the Clarington area centroid. No Clarington-specific capex, water, or jobs figures are disclosed; Bitdeer's 2026 mining capex guidance is company-wide and excludes AI/HPC. Some cooling/jobs figures in secondary coverage describe Bitdeer's separate Shalersville (Portage County) site, not Clarington.
570 MW via a Letter of Agreement with AEP Ohio (May 2025); the utility confirmed the full 570 MW available by end of Q3 2026, ~1 year ahead of schedule. The site is the former Hannibal aluminum-processing plant at the Monroe County Port Authority's Hannibal Industrial Park. No on-site generation confirmed.
Sources and provenance
- Bitdeer announces November 2025 production and operations update · source retrieved 2026-07-07
- Bitdeer announces September 2025 production and operations update · source retrieved 2026-07-08
- Bitdeer expands power pipeline with 570 MW Monroe County partnership · source retrieved 2026-07-08
- Bitdeer Form 6-K (American Heavy Plate Solutions leasehold litigation disclosure) · source retrieved 2026-07-08
- Bitdeer Announces February 2026 Production and Operations Update · source retrieved 2026-09-09
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.