Bitdeer Shalersville Data Center Campus

Bitdeer · Shalersville Township, OH · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
41.199, -81.245
Serving utility, source-reported
Ohio Edison (FirstEnergy)
Operational capacity, source-reported
Not published
Planned capacity, source-reported
750 MW
Source record updated
2026-09-21

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Bitdeer, via local developer Geis Development, proposes a ~257-acre, up-to-750MW campus (150MW phase 1, 15 buildings total) at Turnpike Commerce Center.

    Underlying source
  2. Proposed

    Shalersville Township trustees sign a 6-month extension of the township's data-center moratorium (in effect since October 2024), blocking any project approval through early November 2026.

    Underlying source

Source notes

Turnpike Commerce Center, Shalersville Township, Portage County. Not yet approved — blocked by the township's active data-center moratorium (see community field). Distinct from Bitdeer's other tracked Ohio sites (Clarington, Whitetail Creek/Niles, and Massillon). Tax revenue projections ($2.17M annual increase at phase-1 completion) are Bitdeer's own company projections, not independently confirmed. Coordinates are an approximate geocode of Shalersville Township, not a confirmed parcel pin — no source gave exact site coordinates. Development partner: Geis Development.

Coverage of the proposed 257-acre, up-to-750MW Turnpike Commerce Center campus (Bitdeer + Geis Development) confirms the site is attractive to Bitdeer for "long-term power availability" but no article reviewed (News5Cleveland town-hall coverage, The Portager, TheEnergyMag) discloses a specific interconnection MW figure.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.