Bitdeer Shalersville Data Center Campus
Bitdeer · Shalersville Township, OH · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 41.199, -81.245
- Serving utility, source-reported
- Ohio Edison (FirstEnergy)
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 750 MW
- Source record updated
- 2026-09-21
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Bitdeer, via local developer Geis Development, proposes a ~257-acre, up-to-750MW campus (150MW phase 1, 15 buildings total) at Turnpike Commerce Center.
Underlying source - Proposed
Shalersville Township trustees sign a 6-month extension of the township's data-center moratorium (in effect since October 2024), blocking any project approval through early November 2026.
Underlying source
Source notes
Turnpike Commerce Center, Shalersville Township, Portage County. Not yet approved — blocked by the township's active data-center moratorium (see community field). Distinct from Bitdeer's other tracked Ohio sites (Clarington, Whitetail Creek/Niles, and Massillon). Tax revenue projections ($2.17M annual increase at phase-1 completion) are Bitdeer's own company projections, not independently confirmed. Coordinates are an approximate geocode of Shalersville Township, not a confirmed parcel pin — no source gave exact site coordinates. Development partner: Geis Development.
Coverage of the proposed 257-acre, up-to-750MW Turnpike Commerce Center campus (Bitdeer + Geis Development) confirms the site is attractive to Bitdeer for "long-term power availability" but no article reviewed (News5Cleveland town-hall coverage, The Portager, TheEnergyMag) discloses a specific interconnection MW figure.
Sources and provenance
- Local developer, global tech firm plan major data center project in Portage County · source retrieved 2026-09-21
- Data center discussion spans 3+ hours as Shalersville mulls 257-acre project · source retrieved 2026-07-10
- Bitdeer looks to develop 750MW data center campus in Ohio · source retrieved 2026-07-10
- Asian crypto mining company and Geis partner to bring data center to Shalersville · source retrieved 2026-07-10
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · source retrieved 2026-07-23
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.