BlackRock Data Center, Amherst (CrossPoint Business Park)

BlackRock, Inc. · Amherst, NY · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
43.0432075, -78.7493887
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-09

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Under construction

    Trade press reported construction of BlackRock's Amherst data center in CrossPoint Business Park was set to start.

    Underlying source
  2. Operational

    BlackRock's FY2025 Form 10-K lists an owned 43,000 square foot data center in Amherst, New York.

    Underlying source

Source notes

This is an enterprise data center. The 10-K gives 43,000 sq ft; the 2015 plan described a 31,000 sq ft building in Uniland's CrossPoint Business Park. The 2015 report called it an '$80 million data center construction project', but its itemized costs (about $16M build, $1.3M land, over $16M equipment) total about $33M. No investment figure is recorded because of that unreconciled gap. The same report cites about $6.8M in sales-tax, $2.15M in property-tax and about $165K in mortgage-recording-tax savings. Those figures are not recorded as subsidies because the fetched article does not name the granting agency or confirm final approval. No MW figure is published. No street address was found in a fetched source. Coordinates are the OSM centroid of Crosspoint Parkway, not the building.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory