SOURCE-LINKED U.S. REGISTRY

Former IBM Almaden Research Center Data Center Campus (650 Harry Road)

Blackstart Digital · San Jose, CA · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
650 Harry Road
Coordinates
37.2113478, -121.8083246
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-19

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Blackstart Digital agreed to acquire the former IBM Almaden Research Center; close expected by end of 2026; environmental review requested for renovations

    Underlying source

Source notes

The 35-acre developed area holds seven buildings of more than 500,000 sq ft. It sits within a 687-acre property, and the roughly 565 acres of open space would stay undeveloped. The site already has some data center capacity and is served by a 25 MW substation that Blackstart plans to expand. San José rezoned the campus to an industrial park district in August 2026. The deal is pending and expected to close by end of 2026; both articles relay Mercury News reporting.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory