SOURCE-LINKED U.S. REGISTRY

Blueprint Data Centers Taylor

Blueprint Data Centers · Taylor, TX · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
30.5728854, -97.4141053
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
60 MW
Source record updated
2026-10-14

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    60 MW campus about five minutes from Samsung's Taylor fab, with committed utility power, scheduled to be energized by 2026.

    Underlying source

Source notes

Part of Blueprint's 85 MW, two-site plan. Coordinates are the Taylor city point. The abatement jurisdiction is not named in the source.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory