Blueprint Data Centers Taylor
Blueprint Data Centers · Taylor, TX · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 30.5728854, -97.4141053
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 60 MW
- Source record updated
- 2026-10-14
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
60 MW campus about five minutes from Samsung's Taylor fab, with committed utility power, scheduled to be energized by 2026.
Underlying source
Source notes
Part of Blueprint's 85 MW, two-site plan. Coordinates are the Taylor city point. The abatement jurisdiction is not named in the source.
Sources and provenance
- Blueprint Data Centers plans 85MW Austin expansion, energized by 2026 · source retrieved 2026-10-14
- OpenStreetMap Nominatim geocode: Taylor, TX · source retrieved 2026-10-14
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.