Bridgehead Industrial Project data center option (withdrawn)
JB2 Partners / Oxfoot Oakley LLC · Oakley, CA · United States
Facility record
- Lifecycle
- CancelledSource-reported lifecycle
- Location precision
- exact
- Address as listed
- 3231 Main Street
- Coordinates
- 38.006222, -121.739139
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-09-21
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Bridgehead Industrial Project (164 acres, 10 light-industrial buildings, 3.18M sq ft) included data centers as a permitted use in its PUD application.
Underlying source - Cancelled
Applicant formally removed data centers from the PUD and application 'in its entirety' during the 2026-03-10 council hearing after community opposition; the industrial project was approved 4–1 without them, and Oakley adopted a data center moratorium in April 2026.
Underlying source
Source notes
Only the data center use was withdrawn; the approved 164-acre logistics project (warehousing, truck parking, battery storage) proceeds. No data center capacity was ever specified. Coordinates from the CEQAnet filing (38°0'22.4"N 121°44'20.9"W).
Sources and provenance
- Oakley drops data center plans, approves massive industrial project (2026-03-11) · source retrieved 2026-09-21
- CEQAnet SCH 2024050471 — Bridgehead Industrial Project, Notice of Determination (approved 2026-03-10), 3231 Main Street, Oakley · source retrieved 2026-09-21
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.