Bridgeport Data Center Campus

Undisclosed developer (Bridgeport Industrial Park) · Moreland, GA · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
33.2868748, -84.7679526
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-09-10

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Development of Regional Impact forms submitted; the Three Rivers Regional Commission determined a DRI review was required. The underlying industrial park was approved in 2015 for manufacturing, research, warehousing and office use; the new filing adds data centers.

    Underlying source

Source notes

Six data center buildings with substations proposed on 1,063.9 acres along U.S. 27/29 near Interstate 85, spanning unincorporated Coweta County and Moreland. The applicant is represented by Steven Jones of the McKagen Jones Law Firm; the original 2015 industrial-park developer was listed as P&L Bridgeport 1 and P&L Bridgeport 2, and current control of the data center proposal is not publicly stated, so no operator is asserted. The reported campus valuation is a $3-5 billion range and is therefore not recorded as a single investment figure. Coordinates are approximate to Moreland.