Red Butte Energy and Data Center Campus
BrightNight · Newcastle, UT · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 37.6949, -113.943
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 1500 MW
- Source record updated
- 2026-09-01
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Application submitted May 4, 2026 and deemed incomplete May 22, 2026; on hold under Iron County's 180-day data center moratorium.
Underlying source
Source notes
Approximately 8 miles north of Newcastle, roughly 20 miles from Cedar City; application on hold pending the county's data-center moratorium. Subsidies checked (2026-09-08): structural zero — the project is proposed and on hold under Iron County's moratorium, and no Iron County or Newcastle CRA/RDA was found to execute a pre-approval participation agreement; Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.
Planned hybrid power: 300MW solar, 1,200MWh battery storage, and 1.5GW natural gas generation.
Sources and provenance
- Red Butte Energy and Data Center Campus · source retrieved 2026-08-25
- Proposed Data Center Information — Iron County · source retrieved 2026-08-25
- AI campus proposed in Iron County could bring 500 jobs, on-site power generation · source retrieved 2026-09-01
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.