SOURCE-LINKED U.S. REGISTRY

Project Primestone (Vineyards Research Park) GPU Test Facility

Broadstone Net Lease (developer/owner); operations partner Emergent Data Centers; tenant undisclosed · Colorado Springs, CO · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
3819 Janitell Rd
Coordinates
38.7897826, -104.7932145
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-19

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    City issued a Rapid Response Certificate (expedited review) in May 2026. Broadstone targets substantial completion and rent commencement in 2027.

    Underlying source

Source notes

Two 110,000 sq ft buildings for GPU burn-in, benchmarking and reliability testing for an unnamed 'Fortune 20' technology tenant. The developer's project statement says it is 'not a data center' because it does not sell compute. It is tracked here as a GPU compute facility. The Pikes Peak Bulletin reports a 100 MW initial building with an option to reach 200 MW, but The Gazette attributes the 100 MW figure to T5's 2013 plans, so no capacity is recorded.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.