SOURCE-LINKED U.S. REGISTRY

Cassville Data Center Campus (Undisclosed Developer)

Undisclosed (major tech company, NDA not signed) · Cassville, WI · United States

Facility record

Lifecycle
CancelledSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
42.716, -91.007
Serving utility, source-reported
Alliant Energy
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Grant County Economic Development Corp. disclosed proposal for $1B-$2B campus; developer identity withheld; proximity to Cardinal-Hickory Creek transmission line cited as appeal

    Underlying source
  2. Cancelled

    Town of Cassville voters approved 44-0 an ordinance banning data centers in the township on April 16, 2026; developer went silent after the vote and was reported considering sites in Indiana and North Dakota

    Underlying source

Source notes

Coordinates are Cassville city centroid; proposed site was ~400-500 acres in the town of Cassville. Grant County ED director confirmed company 'people will recognize' but declined to name it. Energy requirement estimated at 400-500 MW (per Wisconsin Watch, citing economic development director estimate). Investment range $1B-$2B; the recorded investment represents the floor. Town vote was April 16, 2026: 44-0 to ban data centers (ordinance lasts up to two years). Developer went silent post-vote and was reportedly considering Indiana and North Dakota sites.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory